Canadian Consulting Engineer


Image

TORONTO WATERFRONT: Moving on
1000147021-1000241542


Central Waterfront transit plan (adapted). The black broken line indicates proposed road tunnel, the red broken line is transit priority improvements, and the green line and broken blue line show proposed streetcar rights-of-way. Small artist renderings show (left to right), proposed Lakeshore Boulevard from east; Lakeshore Boulevard from west diverted by Fort York; proposed green corridor from Don River through port lands. All illustrations from Making Waves, copyright City of Toronto.