Canadian Consulting Engineer

Graham led team selected for Metrolinx Davenport Diamond rail grade separation project

June 18, 2019
By CCE

The project includes the construction of a rail grade separation structure between north-south GO Barrie Rail corridor and east-west CP Rail corridor.

separation

Davenport-Diamond rendering (source: Infrastructure Ontario)

Infrastructure Ontario and Metrolinx have announced that Graham Commuter Rail Solutions has been selected as the preferred proponent to design, build and finance (DBF) the Davenport Diamond Rail Grade Separation project, part of the GO Rail Expansion program.

The Graham Commuter Rail Solutions team includes:

Scope of work for the project includes:

  • Construction of a rail grade separation structure between north-south GO Barrie Rail corridor and east-west CP Rail corridor;
  • Erection of retaining walls forming the approaches of the grade separation structure topped with noise reduction walls to minimize impacts on the community;
  • Construction of a temporary diversion track to enable construction of a new two-track elevated guideway;
  • Modification of an existing at-grade crossing at Wallace Avenue to become a road under rail grade separation;
  • Replacement of Bloor Street West Bridge; and
  • Construction in an active rail corridor with limited access points and staging and coordination with the Barrie Rail Corridor Expansion Grading project.

Advertisement

Advertisement

Stories continue below

Print this page

Related Stories