Canadian Consulting Engineer


Image

Restoring the Cummings Bridge
1000106644-1000235984


Left from top: Removing the original deck, spandrel walls and piers to the top of the arches. Reconstructing the pier cutwater and building a new deck overhang. Reconstructing spandrel walls. The new enclosed west approach with concrete-faced Terratrel wall.