Canadian Consulting Engineer


Image

INFRASTRUCTURE: Port of churchill wharf
1000167541-1000249572


The completed new wharf section consisting of king piles socketed 3.5 metres into bedrock and interlocking sheet piles. Armour plating shields the structure in the tidal zone. The operation to deepen the draught of the loading berth had to be done in up to 12 metres of water.