Canadian Consulting Engineer


Image

Circling Edmonton
1000220759-1000310142


MMM Group Above: the 350-metre long steel flyover at the Calgary Trail Interchange carries traffic over two levels; designers were MMM Group, part of the AREL P3 consortium on the SE quadrant. Right: naturalizing the landscape along the new highway was part of UMA's role. UMA and Stantec led the engineering, construction and project management for the SW quadrant.