Canadian Consulting Engineer


Image

Award of Merit: Antamina Tailings Facility
1000149265-1000252541


The 130-metre high dam. A 0.6 metre thick concrete plinth provides continuity between the grouted foundation and concrete face. A concrete curb system protects the steep upstream slope of filter.