Canadian Consulting Engineer


Image

Award of Excellence: Sheppard Subway Tunnels
1000149206-1000252519


Diagram of the tunnel boring machine (made in Toronto). Behind the cutting head is a chamber (yellow) where excavated material is kept under constant pressure. The precast linings are assembled inside the machine as it moves forward.