Canadian Consulting Engineer


Image

Award of Excellence: Rama 8 Bridge
1000143520-1000268889


Bridge under construction, cantilevered out over the river. The main span is enclosed to give the appearance of a closed box girder without the associated weight and cost. The plenum created by this enclosure is dehumidified and protects the structure from corrosion; longitudinal ribs on the underside of the precast concrete deck panels add strength and stiffness.