Table of Contents

Print Archives

CCE Mag - June 2010

Features

Golden Ears Bridge
A landmark new crossing over the Fraser River east of Vancouver is the longest multi-span, cable-stayed bridge in North America.

Benefiting from Offshore Oil
The oil and gas sector in Newfoundland & Labrador has kept local consulting engineers busy, but the opportunities are changing.

Going Off Chlorine
To reduce risks at two of its largest water treatment plants, the city of Montreal is replacing chlorine with on-site hypochlorite disinfection systems.

The Great Man Made River
SNC-Lavalin of Montreal is playing a major role in a gigantic project -- installing a 4,000-kilometre water pipeline network across the Libyan Desert.

The Day the Rains Came
After torrential rains flooded a new expressway in Hamilton, Ontario, the engineers who designed the drainage system went back to check what had happened.

Digital Modelling Tools
LiDAR, lasers and mobile mapping tools provide more accurate information about the existing terrain or conditions for engineering projects.


Departments

Comment

Up Front

Human Edge

On Board
Rosamund Hyde crosses Canada by rail for business meetings

Engineers & the Law

Developing Brownfields
Regulation changes in Ontario have a big impact

Products